CUSTOM WINDOWS & DOORS
Custom window and door packages begin with controlled project inputs.
Cavorlen reviews drawings, window schedules and BOQs to define opening types, dimensions, glass, hardware, finish, interfaces and evidence. Custom does not mean unrecorded or automatically approved.
Review a project ↗
PROJECT SELECTION
Choose from the opening schedule—not a material slogan.
Use the same project basis for every route. Final system, size, glass, hardware, finish and performance are confirmed only after authorised review.
- Governing drawing and schedule revision
- Opening marks, quantities, dimensions and handing
- Material, glass, hardware, finish and screens
- Performance brief and applicable evidence
- Interfaces, exclusions, packing and delivery sequence
DOCUMENTED ROUTES
Aluminum window systems
Compare documented casement and sliding routes before detailed configuration.
Review documented configuration →02Aluminum door systems
Review the current documented interior sliding-door scope.
Review documented configuration →03uPVC project systems
Begin a project-specific review without invented catalogue claims.
Review documented configuration →EVIDENCE CHECK
What buyers should request before approval.
- 01Marked schedule and clarification register
- 02Proposed sections and shop drawings
- 03Configuration and scope matrix
- 04Approved samples and recorded deviations
- 05Inspection, packing and release records
APPLICATION REVIEW
Common project conversations
Developer-led residential packages
Confirm opening type, size, exposure, interfaces and evidence before selecting the final configuration.
Contractor window schedules
Confirm opening type, size, exposure, interfaces and evidence before selecting the final configuration.
Hotel and apartment repetitions
Confirm opening type, size, exposure, interfaces and evidence before selecting the final configuration.
Distributor project configurations
Confirm opening type, size, exposure, interfaces and evidence before selecting the final configuration.
BUYER QUESTIONS
Short answers before detailed review.
What should be sent for a custom project review?
Provide drawings or a window schedule, quantities, project location, procurement stage and known glass, performance and interface requirements.
Can every requested size or configuration be manufactured?
No automatic approval is implied. Geometry, hardware, glass, performance and production feasibility require authorised review.
When is the final configuration fixed?
After drawings, scope, samples, evidence and commercial terms have been reviewed and formally approved.
CONTINUE THE REVIEW